top of page

We undertook various types of restoration on both the interior and exterior of the apartment. We began by working on the entrance ceilings and the utility room, both of which were completely plastered and painted. Next we focused on the sitting room and kitchen ceilings, which were all restored and varnished using water based paint.

In every room the walls were primed and then painted. We painted the kitchen’s skirting boards a darker color, and finally, gave fresh coats of paint to all the doors, as well as the facade and shutters.

SAN

LEONARDO

 

2021 / 300mq

Drawing1-San Leonardo PT_page-0001_edited.png

LIVING ROOM

ENTRANCE

LAUNDRY ROOM

KITCHEN

Drawing1-San Leonardo P1_page-0001_edited.png

BATHROOM 2

BEDROOM 1

BEDROOM 2

BATHROOM 1

STAIRS

ROOM

FLOOR

MQ

INTERVENTION

Entrance

Ground

6.10

Smoothing walls / Ceiling stucco / Painting

Laundry room

Ground

10.63

Smoothing walls / Ceiling stucco / Painting

Living room

Ground

19.16

Smoothing walls / Overlying stripe / Painting

Kitchen

Ground

30.73

Smoothing walls / Overlying stripe / Baseboard installation and painting / Painting

Stairs

First

-

Smoothing walls / Handrail painting / Painting

Bedroom 1

First

14.60

Smoothing walls

Bathroom 1

First

5.00

Veil covering walls / Marmorino grassy effect

Bedroom 2

First

22.80

Smoothing walls

Bathroom 2

First

5.65

Veil covering walls / Marmorino grassy effect

bottom of page